Cabinet installation for decoration and literacy

2022-07-22
  • Detail

"Cabinets are divided into three products and seven installations." Installation is the last and most critical step of cabinet consumption. Whether the cabinet is installed in place is not only directly related to the beauty of the cabinet, but also related to the satisfaction of future use. What is the process of cabinet installation, and what special attention should be paid to? Owners come and learn

the meaning of cabinet installation

cabinets include bottom cabinets, countertops, and hanging cabinets& ldquo; Cabinets are divided into three products and seven installations& rdquo; Installation is the last and most critical step of cabinet consumption. Whether the cabinet is installed in place is not only directly related to the beauty of the cabinet, but also related to the satisfaction of future use

cabinet installation process

for the overall kitchen cabinet, on-site installation is a very important link. The main steps of kitchen cabinet installation are as follows: 1 Assemble a single lower cabinet (connect the cabinet board with three in one screws after assembling one by one) &mdash& mdash;& rarr; 2. Install the cabinet feet (adjusting feet) &mdash& mdash;& rarr; 3. Connect the lower cabinet &mdash& mdash;& rarr; 4. Install the hinge &mdash& mdash;& rarr; 5. Install the lower cabinet door panel &mdash& mdash;& rarr; 6. Install the upper cabinet (fix it on the wall with expansion screws) &mdash& mdash;& rarr; 7. Install side plates and closing strips &mdash& mdash;& rarr; 8. Install the upper cabinet door panel &mdash& mdash;& rarr; 9. Install the movable door panel with laminated nails &mdash& mdash;& rarr; 10. Install the handle

precautions for cabinet installation

1. It is best to lay the carpet before installation, in order to prevent damage or scratch the floor during unpacking and installation and reduce unnecessary losses

2. Distinguish different categories, such as cabinet body plate, side plate, cabinet door plate, etc

3. After classification, take out and assemble the small parts of the cabinet body. The parts include wooden tenon, three in one link, aluminum pull bag seat, and door hinge. Don't underestimate these things, these small parts can play the role of linking the cabinet body

4. Assemble the cabinet body after the linked parts are installed. There are floors, side panels, back pull bags, etc. to assemble cabinets one by one

5. After the cabinet is assembled, it is necessary to install the foundation under the ground cabinet. After the foundation is installed, the installer begins to measure whether their height is unified

6. The installation personnel shall place the ground cabinets side by side and uniformly adjust the gap angle between the cabinet body and the cabinet body. The same is true for the hanging cabinet, but before installing the hanging cabinet, the installer should first measure the size, install the hanging cabinet and adjust the angle uniformly

7. Edge banding: each edge is sealed with edge banding, and formaldehyde is firmly sealed into the plate

the main thing to pay attention to in this step

the cabinet installation can only be carried out after the kitchen floor tiles and wall tiles are paved and the sewage transformation is completed. If there is a hollow wall on the wall of the kitchen, the cabinet manufacturer should be informed in time, because the hollow wall cannot be installed with a hanging cabinet, and the construction team needs to prepare relevant installation tools in advance. If the installation workers do not understand the situation of the consumer's home comprehensively at the beginning, the cabinets may not be installed after arriving at the site, delaying the installation time